IMPORTANT PROJECTS
“Bulgarian Port Infrastructure Company”
Rehabilitation works at Varna Breakwater– stage II Additional quantities for a protective berm and the breakwater body
NPP “Kozloduy” EAD – Kozloduy
-“Joint’s repair at low-pressure canal of Warm canal 1”
- Repair of 11 and 12 in low-pressure canals of the RO-5 and 6th block
- Delivery of commercial diving equipment
-Cleaning, priming and painting of metal constructions of Hydro-technical installations of ÒÂ
Ministry of Regional Development and Public Works”
“Reconstruction of the main water pipeline for water-supply to Asparuhovo and Galata – crossing the Old and the New Canal”
GBS Invest” EAD
- Underwater survey and measurement in the deepwater pipeline region and measuring the area crossed by the pipelines for building a deepwater mouthing for conducting the purified/waste water of the housing estate/hotel complex at cape Humata- Elaboration of a working project and building of a deepwater mouthing for conducting the purified/waste water of the housing estate/hotel complex at cape Humata
“Asarel Medet” AD – Panagyurishte
- Cleaning of water-suction reservoirs at #II and #III purification stations, lift of alluvia and silt- Repair and rehabilitation of the machine and electro technical facility at the Water Tower and ensuring the temporary halts of “Zhekov Vir” main outlet tunnel
- Restoring and rehabilitation of the bearing reinforcement structure of the water tower.
- Mounting of four valves on #1 slope spillway of #2 collector at Lyulyakovitza wastewater reservoir
NEC EAD Enterprise “Dams and Cascades”
Engineering modernization of the main spillway at “Studen Kladenetz” Dam – in consortium with “Helpik” OODMinistry of Agriculture and Food
Dam “Malko Sharkovo” rehabilitation of the back bottom gate – 2 phase.Phase: ingeneering /building and projecting/, Boliarovo, area of YambolNEC EAD Enterprise
“Reconstruction of the general water-main for water-supply to Belmeken with tetrapodes, damn region “Chaira”NEC EAD Enterprise
Delivery and assembly of under-crane way on the crown of dam wall “Belmeken”, dam area “Chaira”NEC EAD Enterprise
Dismounting of old and mounting of new grids of down horizon of water intake tower of WPP “Pasarel” and cleaning of metal debris in front of the openings - Iskar Dam area“Melrose resources” LTD
Underwater inspection of the Galata platform and the pipeline in relation with the Annual Register Survey Participation in the joining of the offshore gas